(CAML) Central Asia Metals PLC - Share Chat

Discussion in 'General Share Chat (CAML)' started by Makaira88, Mar 28, 2016.

  1. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304
  2. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304
    C0E55395-EC65-4033-B5F4-DF2C7C569CF6.jpeg
    Shares Magazine 27/9/18
     
    Latest Given Reputation Points:
    Graham Hacker: 5 Points (Good one Groucho :-)) Sep 27, 2018
    Makaira88 and Graham Hacker like this.
  3. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304
    4 October 2018


    CENTRAL ASIA METALS PLC

    ('CAML' or the 'Company')

    Q3 2018 Operations Update

    Central Asia Metals plc (AIM: CAML) today provides a Q3 2018 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in Macedonia ('Sasa').

    Highlights

    - Kounrad

    o Q3 2018 copper production, 3,938 tonnes

    - Sasa

    o Q3 2018 zinc in concentrate production, 5,742 tonnes

    o Q3 2018 lead in concentrate production, 7,602 tonnes

    - On track to meet 2018 production guidance

    o Copper 13,000 to 14,000 tonnes

    o Zinc in concentrate 21,000 to 23,000 tonnes

    o Lead in concentrate 28,000 to 30,000 tonnes

    - Shuak

    o 2018 exploration programme approaching completion

    88D2DFED-D5A3-4FDF-B65B-E2B6805F45A4.jpeg

    Nigel Robinson, Chief Executive Officer, commented:

    "We have experienced a good quarter at both of our operations, with copper cathode output at Kounrad up by 2.5% when compared to Q3 2017, and improved zinc recoveries at Sasa. Our production figures confirm that we are on track to achieve 2018 guidance for all three of our metal products."

    Kounrad

    Kounrad Q3 2018 copper production of 3,938 tonnes brings output for the first nine months of 2018 to 10,686 tonnes. Total Kounrad copper production since operations commenced in 2012 is now 79,111 tonnes.

    The total amount of copper recovered from the Western Dumps in the year to 30 September 2018 is 6,950 tonnes, equating to approximately 65% of the 10,686 tonnes plated.

    Copper sales during Q3 2018 were 3,626 tonnes, bringing the total for the first nine months of the year to 9,670 tonnes.

    Sasa

    In Q3 2018, mined and processed ore were 206,406 tonnes and 206,014 tonnes respectively, bringing the total for the first nine months of 2018 to 597,338 tonnes of ore mined and 599,619 tonnes of ore processed. The average head grades for the Q3 2018 period were 3.25% zinc and 3.92% lead, and for the year to date were on average 3.31% and 3.91% respectively. Q3 metallurgical recoveries were 85.7% for zinc and 94.0% for lead. Zinc recoveries have increased during the period as the performance of the new stirred media detritor (SMD) mill that was installed in Q2 2018 has stabilised. Year to date recoveries for zinc and lead average at 84.5% and 93.7% respectively.

    Sasa produces a zinc concentrate and a separate lead concentrate that contains silver. In Q3 2018, 11,658 tonnes of concentrate containing 49.3% zinc and 10,455 tonnes of concentrate containing 72.7% lead were produced. Total year to date production was 34,282 tonnes of zinc concentrate at an average grade of 48.9% and 30,167 tonnes of lead concentrate at an average grade of 72.9%.

    Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q3 2018 payable production of zinc was 4,810 tonnes and of lead was 7,222 tonnes, bringing total payable production for the first nine months of 2018 to 14,020 tonnes of zinc and 20,888 tonnes of lead. Payable base metal in concentrate sales for the nine month period were 13,961tonnes of zinc and 20,882 tonnes of lead.

    During the first nine months of 2018, Sasa sold 278,103 ounces of payable silver. Due to an existing streaming agreement with Osisko Gold Royalties, CAML's silver production has been pre-sold.

    EE772309-23BE-48DE-96AC-06BA389E2DF8.jpeg

    Shuak

    Exploration activities continued during the quarter at Shuak, focussing primarily at the Kyzyl-Sor prospect. A total of 19,467 metres of core hydrotransport drilling has been undertaken and this programme has now concluded.

    A 77 kilometre induced polarisation (IP) geophysical programme to identify sulphide mineralisation has been completed throughout the Shuak area.

    Diamond drilling commenced in August 2018 and, to the end of Q3 2018, 3,815 metres have been drilled, with the programme expected to finish in October 2018. Representative metallurgical samples have been sent to a certified laboratory in Kazakhstan for analysis.
     
    Makaira88 likes this.
  4. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304
    4 January 2019


    CENTRAL ASIAMETALS PLC

    ('CAML' or the 'Company')

    Debt refinancing

    Central Asia Metals plc (AIM: CAML) today announces that it has refinanced its debt, consolidating borrowings into one facility.

    At the time of the Sasa mine acquisition, its entities had debt of$67 million, which CAML inherited. In addition, CAML borrowed$120 millionfrom its offtake partner, Traxys, to part-finance the acquisition, resulting in Group gross debt of$187 millionin November 2017.

    Having made contractual debt repayments of$36 millionsince the acquisition, the Company increased the size of the Traxys facility in December 2018 by$60 millionto$151 millionand used the proceeds to repay the Sasa facility in full and a local bank working capital facility, plus accrued interest.

    This corporate debt facility carries 4.75% interest plus 1-month US Libor and will be repaid monthly on a straight-line basis within four years with no requirement for cash sweeps.

    Nigel Robinson, Chief Executive Officer, commented:

    "We are pleased to have consolidated our borrowings into the one corporate debt facility. Removal of the Sasa debt will enable CAML to restructure and simplify its Sasa corporate structure, which is expected to be completed in Q1 2019."
     
    Makaira88 likes this.
  5. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304
    9 January 2019


    CENTRAL ASIA METALS PLC

    ('CAML' or the 'Company')

    2018 Operations Update

    Central Asia Metals plc (AIM: CAML) today provides a Q4 and full year 2018 operations update for the Kounrad dump leach, solvent extraction and electro-winning ('SX-EW') copper recovery plant in Kazakhstan ('Kounrad') and the Sasa zinc-lead mine in Macedonia('Sasa').

    Highlights

    - Production guidance met for copper, zinc and lead

    - 2018 Kounrad

    o Copper produced, 14,049 tonnes

    - 2018 Sasa

    o Zinc in concentrate produced, 22,532 tonnes

    o Lead in concentrate produced, 29,388 tonnes

    o Diamond drilling exploration programme completed with updated mineral resource estimate expected in Q1 2019

    - 2019 production guidance

    o Copper, 12,500 to 13,500 tonnes

    o Zinc in concentrate, 22,000 to 24,000 tonnes

    o Lead in concentrate, 28,000 to 30,000 tonnes

    - Cash in the bank on 31 December 2018, $39 million

    EE4290A6-D80C-46ED-B0E7-14532E23DDE0.jpeg

    Nigel Robinson, Chief Executive Officer, commented:

    "2018 has been transformational for us, as we have operated both of our assets for a full year, meeting our production targets for the three base metals - copper, zinc and lead.

    "We are also encouraged by the results of the exploration drilling at Sasa and look forward to demonstrating the overall outcome of this work in an updated JORC compliant mineral resource estimate during the current quarter.

    "While we encountered copper mineralisation at Shuak, we believe that this is unlikely to be sufficiently material in terms of scale for us to develop. However, our business development activities gathered momentum during the second half of 2018 and we have been encouraged by some of the opportunities that we have reviewed.

    "Our 2018 annual results are scheduled to be released on 10 April 2019, when our final dividend for 2018 will also be announced."

    Kounrad

    Kounrad Q4 2018 copper production of 3,363 tonnes brings output for 2018 to 14,049 tonnes. Total Kounrad copper production since operations commenced in 2012 is now 82,474 tonnes.

    Total copper recovered from the Western Dumps in 2018 is 8,980 tonnes, equating to approximately 64% of the amount plated.

    Copper sales during Q4 2018 were 4,411 tonnes, bringing the total for the year to 14,081 tonnes. As at 31 December 2018, copper stocks at Kounrad were reduced to 28 tonnes.

    Sasa

    Production and sales

    In Q4 2018, mined and processed ore were 205,762 tonnes and 205,130 tonnes respectively, bringing the total for 2018 to 803,101 tonnes of ore mined and 804,749 tonnes of ore processed. The average head grades for the Q4 2018 period were 3.31% zinc and 3.86% lead, and for the year were on average 3.31% and 3.90% respectively. Q4 metallurgical recoveries were 85.0% for zinc and 93.4% for lead, and for the year were on average 84.6% and 93.6% respectively.

    Sasa produces a zinc concentrate and a separate lead concentrate. In Q4 2018, 11,846 tonnes of concentrate containing 48.7% zinc and 10,151 tonnes of concentrate containing 72.9% lead were produced. Total 2018 production was 46,128 tonnes of zinc concentrate at an average grade of 48.9% and 40,317 tonnes of lead concentrate at an average grade of 72.9%.

    Sasa typically receives from smelters approximately 84% of the value of its zinc in concentrate and approximately 95% of the value of its lead in concentrate. Accordingly, Q4 2018 payable production of zinc was 4,821 tonnes and of lead was 7,031 tonnes, bringing total payable production for 2018 to 18,842 tonnes of zinc and 27,919 tonnes of lead. Given that deliveries from Sasa to the smelters occur on a daily basis, payable base metal in concentrate sales for the year were very similar at 18,792tonnes of zinc and 27,878 tonnes of lead.

    During 2018, Sasa sold 375,366 ounces of payable silver that are recovered in the lead concentrate. Due to an existing streaming agreement with Osisko Gold Royalties, CAML's silver production has been pre-sold.

    12C39904-504D-4ADA-825A-04D99A7BBC9F.jpeg

    Development and exploration

    In Q2 2017, the Sasa team commenced construction of tailings storage facility 4 (TSF4). Construction of this facility is materially complete and is now expected to be concluded in H1 2019. TSF4 should provide tailings storage for seven years.

    During H2 2018, CAML commenced a 'Life of Mine' study at Sasa. This work programme will entail an in-depth review of each aspect of the Sasa operation and is expected to be completed throughout the course of 2019.

    As part of the Life of Mine study, CAML undertook diamond drilling at both Svinja Reka, the location of current mining operations, and Golema Reka, which was mined between 1981 and 2010. The aim of the programme was to identify additional resource potential and to convert a portion of the inferred resources at both deposit areas into the indicated category.

    Svinja Reka

    Svinja Reka currently has JORC compliant inferred mineral resources of 2.7 million tonnes containing 3.2% lead and 2.1% zinc. During the year, over 3,000 metres of diamond drilling have been completed below the 830 metre level at Svinja Reka. Results over a 150 metre strike length have confirmed extensions to mineralisation down to and beneath the 750 metre level at significant intersections. CAML is encouraged that the grades identified in the area below the 830 metre level appear to be higher than the current inferred resource demonstrates.

    08123B08-8FE3-4CD7-AFC9-0C157AA24464.jpeg

    Golema Reka

    Golema Reka currently has JORC compliant inferred mineral resources of 7.4 million tonnes containing 3.7% lead and 1.5% zinc. A programme comprising over 3,000 metres of diamond drilling was undertaken at Golema Reka, generating encouraging intersections over a 350 metre strike length that demonstrate an extension of mineralisation beneath the 700 metre level. Golema Reka is accessible from the current mine infrastructure.

    4F3AA056-AD38-499F-883B-BD080902B8E6.jpeg

    An updated JORC compliant mineral resource estimate reflecting both drilling programmes is expected during Q1 2019.

    2019 production guidance

    CAML targets 2019 Kounrad copper production of between 12,500 and 13,500 tonnes of cathode, of which approximately 70% is expected to be leached from the Western Dumps.

    At Sasa, CAML expects 2019 underground ore production of between 800,000 and 825,000 tonnes. This should result in zinc in concentrate production of between 22,000 and 24,000 tonnes and lead in concentrate production of between 28,000 and 30,000 tonnes.

    Business development

    Shuak

    During 2018, CAML completed the second exploration season at Shuak, undertaking both diamond and core hydrotransport drilling. While the results received have been encouraging, CAML is of the opinion that this project is unlikely to be of sufficient scale to warrant development by the Company. Therefore, CAML plans to return the asset to the current 20% shareholders, while retaining a Net Smelter Return ('NSR') royalty of 1.25% as per the original agreement.

    Other

    During 2018, CAML has screened 22 business development opportunities and conducted three site visits. The Company is currently further reviewing two potential base metals opportunities.

    Cash

    As of 31 December 2018, CAML had cash in the bank of $39 million.
     
    Last edited: Jan 9, 2019
  6. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304
    12585269-B012-4C2A-BDB9-1BA5271F7ECA.jpeg
    Investors Chronicle 11/01/2019
     
    Graham Hacker likes this.
  7. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304
  8. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304
  9. Graham Hacker

    Graham Hacker Moderator Moderator

    Messages:
    1,358
    Reputation:
    2,982
    Always a good coherent approach from Nick. Will continue to hold
     
    Groucho likes this.
  10. Groucho

    Groucho Member

    Messages:
    3,632
    Reputation:
    304